It has been very stressful week in deed after days of work & no off days in between. Feels like all the work just for a 300 allowance is just not right. There is no right justification for the restless work either & the low allowance as well. But nonetheless, the exposure to new sights have gave a wonderful confidence in this field. So lets see what I have done the past days or so.
14th May - Office
- Task preparing tools and equipments for the next day maintenance in UPM.
- Tiring Day Indeed
15th May 2010 & 16th May
Site - UPM
Task - Cast Resin Type Transformer. Servicing & Cleaning of Interior and Exterior of Transformer. Testing Neutral Earth Leakage and Body Earth Leakage. Phase resistance found by meggering secondary side.
Equipment - Clamp Meter & Kyoritsu 5 KV Insulation Tester
16th May - Ogano Water Treatment
- General Maintenance on switchboards.No shut down by tnb, incoming still on. Extra Cautious steps was taken.

17th May - Measat
- You got to be kidding me right, HD channels all set up with backup UPS and server. AABC Network direct to the satellite.General Maintenance in GenSet Room. Followed by Calibration in Upstream, Server Room, AHU- Chiller Room & Pump House.
18th May - Doing testing on Capacitor banks.General Maintenance on LV room, servicing circuit breaker (3 lots) in UPS room & finally HT room.
19th May - IOI Resort
- Calibration in Plaza A. 29 Relays. Oil dashpot, Entes Overcurrent & Earth Fault Relay, Earth Leakage Relay (ELR). Dangerous as supply was on & ct's was behind live busbars.
20th May - IOI Resort
- 18 Relays in Plaza B. Entes Overcurrent & ELRs.
- Dangerous as ct's was behind live busbars.
21st May - Office
- Massive Arranging and Packing in the old office as part of the equipments are being shifted to new office in Goodyear Court 10.
- Arrange equipments in all vehicle for the next 2 day Maintenance.
22nd May - Jabatan Perdana Menteri
- General Maintenance in Prime Minister's Office. Not really tight security, which is good. Haha. In charged in servicing cirucit breakers in UPS & genset room. HT room was serviced thoroughly however LV side, not much done as JPM didnot completely shutdown,thereby there was supply in LV room which is dangerous situation to service. Clearance for 1 hour was given to shutdown though there wasn't enough time to clean all before 7pm all supply was on, so much patience was tested until the boss gave up at 10pm and decided to pack home.
23rd May - Wisma Hamzah
- Was stationed in 23rd Floor in the Chiller Room - Had the change to see massive turbulence & gondola & Chiller plant. Serviced Circuit breakers & general maintenance on the capacitor banks & msb boards.
Sunday, May 23, 2010
14th May till 23rd May - Counting Days
Posted by VK at 8:05 AM 0 comments
Tuesday, May 18, 2010
HT, LV & Switchboard, ACB & VCB...
The only LV I knew before TCME was Louis Vuitton, but since then I have grown up to know that this abbreviations are also used in Electrical Field. LV stands for low voltage side and HT is for high voltage terminal. Hence there two switchboards needed if you are starting up a factory which are the LV switchboard and HT switchboard.HT are from the utility provider or in our normal language direct from TNB.
A circuit breaker is an automatically-operated electrical switch designed to protect an electrical circuit from damage caused by overload or short circuit. Its basic function is to detect a fault condition and, by interrupting continuity, to immediately discontinue electrical flow. Unlike a fuse, which operates once and then has to be replaced, a circuit breaker can be reset (either manually or automatically) to resume normal operation. Circuit breakers are made in varying sizes, from small devices that protect an individual household appliance up to large switchgear designed to protect high voltage circuits feeding an entire city.
Posted by VK at 6:30 AM 0 comments
More Knowledge Gained : UPS
As days goes by, more knowledge is gained in TCME. This post is about UPS which I personally came across when we were servicing, commisioning and testing in MEASAT. Well its not a courier service if thats what you think UPS stands for but the abbreviation is for Uninterruptible Power Supply. Likewise the name, the urgency,instantaneous and endless need for power supply has forced the human brain to create such thing that will provide the demand for power even if TNB chooses to take a nap or go on strike.
From wikipedia:
An uninterruptible power supply, also uninterruptible power source, UPS or battery/flywheel backup, is an electrical apparatus that provides emergency power to a load when the input power source, typically the utility mains, fails.
A UPS differs from an auxiliary or emergency power system or standby generator in that it will provide instantaneous or near-instantaneous protection from input power interruptions by means of one or more attached batteries and associated electronic circuitry for low power users, and or by means of diesel generators and flywheels for high power users. The on-battery runtime of most uninterruptible power sources is relatively short—5–15 minutes being typical for smaller units—but sufficient to allow time to bring an auxiliary power source on line, or to properly shut down the protected equipment.
While not limited to protecting any particular type of equipment, a UPS is typically used to protect computers, data centers, telecommunication equipment or other electrical equipment where an unexpected power disruption could cause injuries, fatalities, serious business disruption and/or data loss. UPS units range in size from units designed to protect a single computer without a video monitor (around 200 VA rating) to large units powering entire data centers, buildings, or even cities.
There are some terms you need to know as well which I picked up such as Surge - a sudden increase in the mains voltage. Sag - Sag: defined as a momentary or sustained reduction in input voltage and the moss common Power failure: defined as a total loss of input voltage.
So what is the technology behind an UPS you ask??? Well.. this is the story
The general categories of modern UPS systems are on-line, line-interactive or standby. An on-line UPS uses a "double conversion" method of accepting AC input, rectifying to DC for passing through the rechargeable battery (or battery strings), then inverting back to 120V/240V AC for powering the protected equipment.
A line-interactive UPS maintains the inverter in line and redirects the battery's DC current path from the normal charging mode to supplying current when power is lost. In a standby ("off-line") system the load is powered directly by the input power and the backup power circuitry is only invoked when the utility power fails. Most UPS below 1 kVA are of the line-interactive or standby variety which are usually less expensive.

Posted by VK at 6:02 AM 0 comments
Thursday, May 13, 2010
So what is the big Deal with This RELAYS???
Imagine if there is no roof in your house, do you think your house can be you shelter anymore. Does your house protects you from the blazing weather?? The roof is the protection for your home and so is a relay to your equipments installed in your offices and factories. Read below
Relay is one of the many protections must-haves for electrical hazard protection. It is basically an complex switch or circuit breaker. Basically, the relay will protect the circuits from 2 types of electrical hazard, namely earth fault & over current.
From wikipedia:
A protective relay is a complex electromechanical apparatus, often with more than one coil, designed to calculate operating conditions on an electrical circuit and trip circuit breakers when a fault is detected. Unlike switching type relays with fixed and usually ill-defined operating voltage thresholds and operating times, protective relays have well-established, selectable, time/current (or other operating parameter) curves. Such relays may be elaborate, using arrays of induction disks, shaded-pole magnets, operating and restraint coils, solenoid-type operators, telephone-relay style contacts, and phase-shifting networks. Protection relays respond to such conditions as over-current, over-voltage, reverse power flow, over- and under- frequency, and even distance relays that would trip for faults up to a certain distance away from a substation but not beyond that point. An important transmission line or generator unit will have cubicles dedicated to protection, with a score of individual electromechanical devices. The various protective functions available on a given relay are denoted by standard ANSI Device Numbers. For example, a relay including function 51 would be a timed overcurrent protective relay.
An over-current happens when the current passing through the relay is over the rated current. The relay will be such that if the current's magnitude is nth times the rated value, the relay should disconnect the circuit under certain time. How much time the relay needs to disconnect depends on its setting. If the relay's respond time is near the set time, then the relay is said to pass the test. We usually test the relays at n=1.6, 2.4, & 3.2 (multiples of 80%).
Earth fault happens when more current flow than what it is supposed to from any of the RYB (red-yellow-blue) phase to neutral (N). When this happens, the relay should also disconnect the circuit after a set time.
Posted by VK at 5:24 AM 0 comments
10th of May to 13th of May - Misses Day Off.
I want a day off. Really exhausted and all part of the human body is aching even the one's not related..Seriously.
This week updates for now is..
Monday - Cable Fault in Inspens (Near Uniten). Wondering what the abbreviation for Inspen is Institute Penilaian Negara.
Tuesday - UPM & Winstrad Industries - listing information their new circuit breakers and relays. For your information all of them are installed with Schneider equipments so imagine the cost.
Wednesday - Winstrad Industries - Picked up from whats left from yesterdays job doing calibration on their new switchboards for their high end customer - Freescale. Haha.. no wonder all of them are Schneider products. Tested their relay - most of them was earth fault relays and elr's which is easier to calibrate. I have really mastered the artwork of this relays. Next was testing the Current Transformers in case if there is any failure and next was doing trip test on the circuit breakers (ACB's). Learned some new trick on the book by the boss Mr.Lee.
Posted by VK at 5:09 AM 0 comments
3rd May to 9th May 2010 - No one teaches, you watch and learn son.
Its hard if you got to watch and learn. Lets say if you were watching some super Jackie Chan stunts,do you think you will be able to do the stunts back or at least tell how the stunts are made the right second you watch it?? Working is hard but learning the job is even harder, it needs patience and lots of practise which is hard to gain in this short 3 months of training.
Alright enough of the wise men says... This week updates are as below.
Monday - Office - Take a break and clean the mess in the office. Bring down all the equipments - generator (each weighs slightly more than 30kg), service boxes, power tools, cloths, ladder and etc.
Tuesday - Wisma Pengkalan (KL) - (I Tell you the parking system in the building is dashyat..its like what you see in Tokyo Drift) & Ban Seng Lee Industries. What we did was calibration on the relays installed on on the LV switchboards. Type of relay Instataneous CDG and oil dashpot in Wisma Pengakalan. and Haiko in Ban Seng Lee.
Wednesday - Went UPM to check the battery charger as the volts of float were quite high and then went to KLIE rentals to do testing on their second hand imported Generator from Japan.
Thursday - 10-4pm National Library - A
4-8pm - JPJ Padang Jawa - B
A)Went to do some maintenance job in the ahu room in National Library. Tested the relays, changed capacitors in capacitor bank and its contact.
B) Went on to help to find cable fault in JPJ Padang Jawa, Shah Alam.
Friday - Wisma Pengakalan & office
- Testing transformer oil and maintenance in their Generator Room .
Saturday & Sunday - Like usual maintenance in UPM.
Posted by VK at 4:49 AM 0 comments
29th April, 30th April, 1st May & 2nd May - Screw Labours Day'
Thursday & Friday - Rested in office this two days. Cleaned our equipments arranged them and make things work again.
Saturday & Sunday-
There is no such word as Labours Day. In TCME, you are a boss not a labour so thereby this day is not applicable to you. How Lucky? (sigh.. my sarcasm is turning high). From this week on every weekend will be maintenance,maintenance and more maintenance in UPM whereby we will maintaining and servicing all substations in UPM including 3 main intakes (pencawang utama) and 33 other substations. If you do the maths this is so impossible to finish.A typical substation at least has 1 to 2 transformer and 3 to 5 circuit breakers. These all to be cleaned, meggered (doing testing), greased and make it shine. It takes at least 5 strong mens to do the job and the time frame is half a day which means each team has to finish two substations by the end of the day.TCME have gathered more men than army we have about 20 good men to do the job in in those substations this weekend. Around 10 substations was finished including 2 main intakes whereby if not mistaken has more than 10 circuit breakers and 2 33kv transformer (by the way..its really huge) and 1 11kv transformers. I myself i have climed one in StatsCHipPac 33kv transformer and its really big.
Tasks at subsations & procedures:
1. Safety briefing by Kapten - Mr.Gan Eu Jin aka Small Boss aka Mr.1000 (photos to be uploaded)
2. Clearance by team leader - that the substation has no connections as because the substations are ringly connected, whereby we can simply off a few offpoints (substations) whereby the rest of the locations will not be affected.
3. Cleaning transformer
4. Cleaning busbar and meggering busbar- check for raychem melting - if there are melting remove them from busbar and their replaced with heavy insulation tape.
5. Cleaning and greasing circuit breaker and meggering (insulation test - 5kv) circuit breaker, also performing vacuum test (or pressure test) whereby injecting 14kv for 1minute and check if there any flash over on circuit breaker (VCB's).
6. Meggering the cables to other substations.
7. Meggering or clamping the earth of the earth body, neutral earth of transformer
8. Finally switching by team leader.
So, there you have it this is the task and if you think this easy try doing it for the rest of your life with the surroundings of a dessert and stacked by people of emotions like Sattan Hussein ((simply if not will be traced by the u,s).
Chao.
Posted by VK at 4:20 AM 0 comments